MIKE 3 Flow Model requires this hotfix to be installed to ensure a proper handling of a hot-started setup using source/sinks.
This hotfix ensures that SWMM5 DWF loads are correctly transferred to MOUSE Network Loads table in scenario management. This hotfix includes a correction for Data Assimilation where reservoir water levels was not correctly updated.
This hotfix ensures that water levels are initialised individually for each PST before static volume calculations in MOUSE, and solves a problem in 32 bit MOUSE when using a very large number of catchments.
This hotfix solves a problem with access violation in the 'dfsTSBridge.dll' time series bridge. This hotfix solves a problem with wrong output specification of data type and unit of computed load in the MIKE HYDRO Load Calculator tool. This hotfix solves a MOUSE Advection Dispersion error in which the calculating grid points running AD hot start simulations do not match with the model network. This hotfix fixes an instability in Kinematic Wave (Model B) runoff model for large time steps.
This hotfix solves a problem when adding baseflow contribution to the load calculation in the MIKE HYDRO Basin, LOAD calculator tool. This hotfix address the issue of the MOUSE engine not creating a warnings file when started with hidden GUI.